PROJECT
JLR GAYDON
JLR GAYDON TRIANGLE
PROJECT NAME :
LOCATION :
GAYDON, COVENTRY
PRINCIPAL CONTRACTOR :
LAING O’ROURKE
FAÇADE DESIGN & MANUFACTURER :
PRATER LIMITED
ARCHITECT :
BENNETTS ASSOCIATES
CTR Site Services Ltd. Were awarded the complete building envelope, Lifting & Logistics package on the JLR Gaydon Triangle project alongside the installation of Kawneer Stickwork Curtain Wall.
“CTR Site Services Ltd provided both logistics and installation teams (Kawneer stick curtain walling) at JLR, Gaydon and have proved both reliable and flexible while ensuring an excellent
standard of workmanship.” – William Morrison, BSc (Hons) Project Director
“CTR carried out the installation of the curtain wall to a high standard and snag free. I would highly recommend them and consider working with them on future projects”
Paul Ryan, Senior Project Manager
PROJECT GALLERY
HIRE US FOR YOUR PROJECT