PROJECT
JLR GAYDON

JLR GAYDON TRIANGLE

PROJECT NAME :

Case Study – JLR Gaydon Triangle

LOCATION :

GAYDON, COVENTRY

PRINCIPAL CONTRACTOR :

LAING O’ROURKE

FAÇADE DESIGN & MANUFACTURER :

PRATER LIMITED

ARCHITECT :

BENNETTS ASSOCIATES

CTR Site Services Ltd. Were awarded the complete building envelope, Lifting & Logistics package on the JLR Gaydon Triangle project alongside the installation of Kawneer Stickwork Curtain Wall.

 

“CTR Site Services Ltd provided both logistics and installation teams (Kawneer stick curtain walling) at JLR, Gaydon and have proved both reliable and flexible while ensuring an excellent
standard of workmanship.” – William Morrison, BSc (Hons) Project Director

“CTR carried out the installation of the curtain wall to a high standard and snag free. I would highly recommend them and consider working with them on future projects”

Paul Ryan, Senior Project Manager

PROJECT GALLERY

HIRE US FOR YOUR PROJECT